Resource Type

Journal Article 710

Conference Videos 40

Conference Information 1

Year

2024 1

2023 32

2022 56

2021 63

2020 30

2019 40

2018 22

2017 43

2016 22

2015 29

2014 27

2013 44

2012 36

2011 58

2010 49

2009 41

2008 25

2007 28

2006 14

2005 10

open ︾

Keywords

construction 28

ecological civilization 17

construction management 15

Three Gorges Project 12

construction technology 10

system construction 10

construction industry 7

sustainable development 7

dam 6

arch dam 5

construction project 5

project management 5

BIM 4

Sutong Bridge 4

Three Gorges Project ship lift 4

concrete 4

ecological civilization construction 4

green construction 4

numerical simulation 4

open ︾

Search scope:

排序: Display mode:

Influence of soft rock-fill material as dam embankment with central bituminous concrete membrane

Peter TSCHERNUTTER

Frontiers of Structural and Civil Engineering 2011, Volume 5, Issue 1,   Pages 63-70 doi: 10.1007/s11709-010-0016-3

Abstract: Laboratory as well as field tests on solid rock-fill material were performed before the beginning ofconstruction.During the construction the properties of the available rock-fill changed from solid to soft materialsThis gave rise to the necessity of adjusting the dam design of the downstream dam shoulder.and downstream dam shell were observed during construction and operation.

Keywords: embankment dam     bituminous concrete membrane     rock-fill material properties     deformation behavior    

Theory and application of construction simulation for roller compaction of high core rock-fill dam

Zhong Denghua,Zhao Chensheng,Zhang Ping

Strategic Study of CAE 2011, Volume 13, Issue 12,   Pages 28-32

Abstract: style="text-align: justify;">Based on the overall analysis of roller compaction system of high core rock-filldam, the theory of construction simulation for roller compaction is put forward and the simulation modelis set up which can actually reflect the uncertainties of the rock-fill dam roller compaction to ensurethe simulation to be more close to the actual construction.core rock-fill dam to verify the reliability of the simulation model, which gives important guidance

Keywords: high core rock-fill dam     roller compaction     construction simulation    

Development and application of the real-time monitoring system for filling construction process of highcore rock-fill dam

Cui Bo,Hu Lianxing,Liu Donghai

Strategic Study of CAE 2011, Volume 13, Issue 12,   Pages 91-96

Abstract:

In this paper, on the basis of research on high core rock-fill dam fillingmonitoring is determined; the solution scheme is proposed; the monitoring system of core rock-fill damThe monitoring system is applied in the construction field of the highest earth rock-fill dam in Asia, Nuozhadu core rock-fill dam, as the core component of the construction process control architecture, achieving refining, all-whether and real-time control on key links of dam filling construction, which

Keywords: high core rock-fill dam     filling construction process     real-time monitoring     transportation to dam     rollingon dam surface     development and application    

Analysis on damage causes of built-in corridor in core rock-fill dam on thick overburden: A case study

Jia’ao YU; Zhenzhong SHEN; Zhangxin HUANG

Frontiers of Structural and Civil Engineering 2022, Volume 16, Issue 6,   Pages 762-780 doi: 10.1007/s11709-022-0847-8

Abstract: The stress state of the built-in corridor in core rock-fill dam on thick overburden is extremely complexinvestigate the effect of thick overburden on the stress and deformation of the built-in corridor in a rock-filldam, and ascertain the damage causes of the corridor.And the calculation model considering dam construction process, contact between concrete and surrounding

Keywords: thick overburden     built-in corridor     stress     deformation     causes for damage     concrete damaged plasticity    

Key technologies of real-time construction control for major hydraulic and hydroelectric projects

Ma Hongqi,Zhong Denghua,Zhang Zongliang,Sun Yujun,Liu Donghai

Strategic Study of CAE 2011, Volume 13, Issue 12,   Pages 20-27

Abstract: justify;">The quality control and schedule control are the significant technical problems in high core rock-filldam and high concrete dam construction.rock-fill dam and to control timely schedule of high concrete dam under high-intensity continuous constructionReal-time compaction quality monitoring technology of high core rock-fill dam, real-time entire-processconstruction schedule.

Keywords: high core rock-fill dam     high concrete dam     construction quality     construction schedule     real-time monitoring     digital dam    

Study on the Model and Its Visualization for Dynamic Allocation of Earth

Hu Chengshun,Zheng Denghua,Zhang Jin,Hong Wen,Li Mingchao

Strategic Study of CAE 2003, Volume 5, Issue 12,   Pages 73-79

Abstract:

For construction organization plan, the optimized allocation and overall balance of earth is of greatsignificance to reduce the project cost and ensure the construction period in the construction of rock-filldam.At last a large-scale rock-fill dam is illustrated.

Keywords: rock-fill dam construction     earth allocation     dynamic allocation     linear programming     visualization    

Evaluation method of dam behavior during construction and reservoir filling and application to real dams

Yuji KOHGO, Akira TAKAHASHI, Tomokazu SUZUKI,

Frontiers of Structural and Civil Engineering 2010, Volume 4, Issue 1,   Pages 92-101 doi: 10.1007/s11709-010-0009-2

Abstract: In this paper we analyzed a real fill-type dam, named the Minami-Aiki Dam, to verify a numerical consolidationThe validities were conducted by comparing the analyzed and measured values during construction and impoundingThis method is valid for estimating behavior of fill-type dams during construction and impounding.

Keywords: fill dam     consolidation analysis     unsaturated geo-materials     impounding     construction    

A Brief Review of Rock-Filled Concrete Dams and Prospects for Next-Generation Concrete Dam Construction Review

Feng Jin, Duruo Huang, Michel Lino, Hu Zhou

Engineering 2024, Volume 32, Issue 1,   Pages 100-106 doi: 10.1016/j.eng.2023.09.020

Abstract:

Over the past few decades, one of the most significant advances in dam construction has been the inventionof the rock-filled concrete (RFC) dam, which is constructed by pouring high-performance selfcompactingconcrete (HSCC) to fill the voids in preplaced large rocks.  The innovative use of large rocks in dam construction provides engineers with a material thatrequires less cement consumption and hydration heat while enhancing construction efficiency and environmental

Keywords: Rock-filled concrete dam     Pouring compactness     Effect of large rocks     Intelligent quality control     Unmanneddam construction    

Treatment of Highly Weathered Rock Mass at the Abutment of Earth-Rock Dam in Qiaoqi Hydropower Project

Wang Shougen

Strategic Study of CAE 2005, Volume 7, Issue 3,   Pages 78-83

Abstract:

The abutment is the part where the by-pass seepage and contact erosion often happen to make the damnot work normally, which is the key point during design and construction, so Design Specifications forRolled Earth-Rock Fill Dams (SL274-2001) require excavating into the slightly weathered rock mass forThe spreading gradation earth-rock fill dam with crushed-stone-earth core wall is 123m high, and theadopt consolidation grouting and seepage treatment measures is argued and the treatment measures and construction

Keywords: Qiaoqi Hydropower Station     earth-rock dam     treatment of abutment     highly weathered rock mass     consolidation    

Challenges of high dam construction to computational mechanics

ZHANG Chuhan

Frontiers of Structural and Civil Engineering 2007, Volume 1, Issue 1,   Pages 12-33 doi: 10.1007/s11709-007-0002-6

Abstract: The current situations and growing prospects of China s hydro-power development and high dam constructionThese include but are not limited to: stress and stability analysis of dam foundations under externalloads; earthquake behavior of dam-foundation-reservoir systems, mechanical properties of mass concreteCom pacted Concrete (RCC) dams and Concrete Face Rock-fill (CFR) dams.of arch dams under reservoir loads, and failure analysis of arch dam-foundations.

Keywords: reservoir     engineering     hydro-power development     state-of-the-art computational     earthquake    

Research on key construction technologies of concrete dam heightening project

Zhou Hougui

Strategic Study of CAE 2012, Volume 14, Issue 7,   Pages 87-92

Abstract:

Based on construction practice of worldwide concrete dam heightening project, 4 key construction technologiesof concrete gravity dam heightening project by the integral heightening mode on the existing dam bythe down stream side and on the dam crest were systematically summarized.demolition and transference of old structures, and resources temporal and spatrial allocation curing constructionperiod, For each key construction technology, the construction technical difficulties, features and

Keywords: construction technology     dam heightening     concrete dam     hydraulic and hydropower engineering    

The Cemented Material Dam: A New, Environmentally Friendly Type of Dam

Jinsheng Jia, Michel Lino, Feng Jin, Cuiying Zheng

Engineering 2016, Volume 2, Issue 4,   Pages 490-497 doi: 10.1016/J.ENG.2016.04.003

Abstract:

The first author proposed the concept of the cemented material dam (CMD) in 2009.This concept was aimed at building an environmentally friendly dam in a safer and more economical wayfor both the dam and the area downstream.The concept covers the cemented sand, gravel, and rock dam (CSGRD), the rockfill concrete (RFC) dam (or the cemented rockfill dam, CRD), and the cemented soil dam (CSD).

Keywords: Cemented material dam (CMD)     Cemented sand,gravel,and rock dam (CSGRD)     Rockfill concrete (RFC) dam     Cementedrockfill dam (CRD)     Cemented soil dam (CSD)     Material properties    

China's High Dams Construction and Research on Science and Technology

Chen Zongliang

Strategic Study of CAE 2000, Volume 2, Issue 12,   Pages 84-89

Abstract:

The development and characteristics of high dams construction in China are introduced.The scientific and technological achievements and their application in geologic exploration, dam construction, flood discharging and energy dissipation, treatment of dam foundation and treatment of high rock slopeheight have been constructed, and there are 16 dams with height over 150 m to be completed or under constructiongravity dam, etc.

Keywords: hydroelectric power     high dam     gravity dam     arch dam     roller compacted concrete dam (RC-CD)     concrete facerockfill dam (CFRD)    

Analysis of foundation sliding of an arch dam considering the hydromechanical behavior

Maria Luísa Braga FARINHA, José Vieira de LEMOS, Emanuel MARANHA DAS NEVES

Frontiers of Structural and Civil Engineering 2012, Volume 6, Issue 1,   Pages 35-43 doi: 10.1007/s11709-012-0142-1

Abstract: This paper presents the application of a methodology which can be used to assess arch dam foundationA global three-dimensional model of a dam foundation was developed, in which some discontinuities werewater pressures were applied on discontinuities involved in the possible sliding mechanism along the dam, commonly used in concrete dam design.The relevance of carrying out hydraulic analysis in arch dam foundation failure studies is highlighted

Keywords: concrete dams     rock foundations     hydromechanical behavior     failure analysis    

Realtime prediction of hard rock TBM advance rate using temporal convolutional network (TCN) with tunnelconstruction big data

Zaobao LIU; Yongchen WANG; Long LI; Xingli FANG; Junze WANG

Frontiers of Structural and Civil Engineering 2022, Volume 16, Issue 4,   Pages 401-413 doi: 10.1007/s11709-022-0823-3

Abstract: Real-time dynamic adjustment of the tunnel bore machine (TBM) advance rate according to the rock-machineinteraction parameters is of great significance to the adaptability of TBM and its efficiency in constructionreal-time predictive model of TBM advance rate using the temporal convolutional network (TCN), based on TBM constructionprediction model was built using an experimental database, containing 235 data sets, established from the constructionwork provides a new concept of real-time prediction of the TBM performance for highly efficient tunnel construction

Keywords: hard rock tunnel     tunnel bore machine advance rate prediction     temporal convolutional networks     softcomputing     construction big data    

Title Author Date Type Operation

Influence of soft rock-fill material as dam embankment with central bituminous concrete membrane

Peter TSCHERNUTTER

Journal Article

Theory and application of construction simulation for roller compaction of high core rock-fill dam

Zhong Denghua,Zhao Chensheng,Zhang Ping

Journal Article

Development and application of the real-time monitoring system for filling construction process of highcore rock-fill dam

Cui Bo,Hu Lianxing,Liu Donghai

Journal Article

Analysis on damage causes of built-in corridor in core rock-fill dam on thick overburden: A case study

Jia’ao YU; Zhenzhong SHEN; Zhangxin HUANG

Journal Article

Key technologies of real-time construction control for major hydraulic and hydroelectric projects

Ma Hongqi,Zhong Denghua,Zhang Zongliang,Sun Yujun,Liu Donghai

Journal Article

Study on the Model and Its Visualization for Dynamic Allocation of Earth

Hu Chengshun,Zheng Denghua,Zhang Jin,Hong Wen,Li Mingchao

Journal Article

Evaluation method of dam behavior during construction and reservoir filling and application to real dams

Yuji KOHGO, Akira TAKAHASHI, Tomokazu SUZUKI,

Journal Article

A Brief Review of Rock-Filled Concrete Dams and Prospects for Next-Generation Concrete Dam Construction

Feng Jin, Duruo Huang, Michel Lino, Hu Zhou

Journal Article

Treatment of Highly Weathered Rock Mass at the Abutment of Earth-Rock Dam in Qiaoqi Hydropower Project

Wang Shougen

Journal Article

Challenges of high dam construction to computational mechanics

ZHANG Chuhan

Journal Article

Research on key construction technologies of concrete dam heightening project

Zhou Hougui

Journal Article

The Cemented Material Dam: A New, Environmentally Friendly Type of Dam

Jinsheng Jia, Michel Lino, Feng Jin, Cuiying Zheng

Journal Article

China's High Dams Construction and Research on Science and Technology

Chen Zongliang

Journal Article

Analysis of foundation sliding of an arch dam considering the hydromechanical behavior

Maria Luísa Braga FARINHA, José Vieira de LEMOS, Emanuel MARANHA DAS NEVES

Journal Article

Realtime prediction of hard rock TBM advance rate using temporal convolutional network (TCN) with tunnelconstruction big data

Zaobao LIU; Yongchen WANG; Long LI; Xingli FANG; Junze WANG

Journal Article